
ONTARIO SCIENCE CENTRE
Supply and installation of two 25 ton gas fired Rooftop Units. The work also consisted of sheet metal upgrades, controls, craning and permits with the city, duct cleaning, balancing and insulation as per engineers drawings and specifications.